Overview of the Proposed Road Development
The proposed N63 Liss to Abbey Realignment Scheme consists of the construction of a new 2.3km of National Secondary Road and all ancillary and consequential works including the provision of a bridge over the River Abbert. Provision of both pedestrian and cycle facilities have been included as part of the Proposed Road Development, predominantly along the route of the existing N63. The Proposed Road Development is located in the townlands of Culliagh North, Culliagh South, Liss, Abbey, Chapelfield, Clashard, Moyne and Newtown in Co. Galway.
General Description of the Proposed Road Development
The main elements of the proposed road development include the following:
- Approximately 2.3 km of new Type 2 Single Carriageway road (predominantly offline);
- One new roundabout at the western end of the Proposed Road Development to provide connection with the existing N63;
- Two new priority junctions to provide connection to the existing L6159 and L6234, including some minor local road realignments;
- One new clear span steel girder bridge crossing of the Abbert River;
- A number of new piped culverts and two new box culverts over existing field ditches;
- Three new flood alleviation culverts (box culverts);
- New pedestrian and cycle facilities, predominantly located along the existing N63;
- Associated earthworks including excavation of unacceptable material, excavation and processing of rock and other material, and recovery of unacceptable material for re-use in the works;
- Accommodation works, including the provision of access roads and accesses;
- Drainage works, including the construction of attenuation ponds in accordance with sustainable drainage design principles and guidance;
- Treatment of surface water run-off prior to outfall discharge, spill containment measures and attenuation treatment facilities;
- Utilities and services diversion works including medium voltage (10 kV/20 kV) overhead lines and EIR overheard lines;
- Safety barriers, public lighting, fencing;
- A viewing area for Knockmoy Abbey with parking;
- Landscaping planting works, signage, lighting and other works ancillary to the construction and operation of the Proposed Road Development;
- Construction of farm access tracks with accommodation works ancillary to the Proposed Road Development; and
- Environmental measures and other ancillary works.
N63 Liss to Abbey CPO Approval
N63 Liss to Abbey - GCC CPO Confirmation Notice
N63 Liss to Abbey Road Application Approval
Brief Of Evidence – Biodiversity
Response to Submissions & CPO Objections
Environmental Impact Assessment Report:
EIAR – Vol. 1 Non-Technical Summary
EIAR – Vol. 3 Figures – Cover Sheet and Table of Contents
EIAR – Vol. 3 Figures – Figure A1-1 – Figure A3-7
EIAR – Vol. 3 Figures – Figure A4-1 – Figure A4-10
EIAR – Vol. 3 Figures – Figure A4-11 – Figure A4-18
EIAR – Vol. 3 Figures – Figure A4-19 – Figure A4-33
EIAR – Vol. 3 Figures – Figure A7-1 – Figure A7-12
EIAR – Vol. 3 Figures – Figure A8-1 – Figure A8-2
EIAR – Vol. 3 Figures – Figure A8-3 – Figure A8-4
EIAR – Vol. 3 Figures – Figure A9-1 – Figure A10-1
EIAR – Vol. 3 Figures – Figure A13-1 – Figure A13-7
EIAR – Vol. 3 Figures – Figure A14-1 – Figure A14-3
EIAR – Vol. 3 Figures – Figure A14-4 – Figure A17-1
EIAR – Vol. 4 Appendices – Cover Sheet and Table of Contents
EIAR – Vol. 4 Appendices – Appendix A1-1 - Appendix A7-10
EIAR – Vol. 4 Appendices – Appendix A8-1 - Appendix A10-1
EIAR – Vol. 4 Appendices – Appendix A12-1 - Appendix A17-1
Design Report
Design Report – Vol. 1 Main Report
Design Report – Vol. 2 Figures - Cover Sheet and Table of Contents
Design Report – Vol. 2 Figures – 0001 - 0009
Design Report – Vol. 2 Figures – 0010 - 0023
Design Report – Vol. 2 Figures – 0101 - 0112