Dunkellin Drainage District
- Other relevant links
- Winter Maintenance
- Roads Contact Details
- Roads Forms & Downloads
- Galway Transport Strategy
- Motor Tax
- National Galway to Dublin Cycleway
- Clifden to Oughterard Greenway
- Galway to Oughterard Greenway
- Weather Related Road Closures
- Temporary Road Closures
- Public Lighting
- Licences & Permits
- Traffic Management & Parking
- Road Safety
- Road Construction
- Bridge Construction
- Roads Programme
- Roads Projects
- Marine
- Dunkellin Drainage District
- Active Travel
- Catchment Flood Risk Assessment and Management
- Housing Estates - Taking in Charge of Estates
- Noise Action Plan
- Roads and Services Enquiries
- Screening for Appropriate Assessment Decisions
The Dunkellin River and the Aggard Stream form part of the Dunkellin Drainage District which was constructed in or around 1857 and Galway County Council has a statutory maintenance responsibility for these works. In 2010 a study on the Dunkellin River and the Aggard Stream (from Craughwell Village to Kilcolgan) was commissioned as a result of flooding that occurred in the area in November 2009. Galway County Council is now progressing the Flood Relief Scheme to design stage and has submitted the Scheme for planning approval to An Bord Pleanála (ABP) in line with Section 175 of the Planning and Development Act 2000, as amended. The scheme includes for flood relief works to be completed along the main channel of the Dunkellin River from Craughwell to Kilcolgan (over 11km) and along the Aggard Stream which runs from the townland of Cregaclare (near Ardrahan) to its outfall at the confluence of the Dunkellin and Craughwell Rivers (over 7.5km). A combination of river widening, deepening, culvert upgrade and replacement, bridge improvement and replacement and general channel maintenance make up the proposed measures for this scheme. The intention of the scheme is to provide optimum flood relief with minimal environmental impact whilst also controlling the overall capital investment required.
- Cover Letter ABP 08.10.14
- Newspaper Notice- Dunkellin 22.09.14
- EIS Revision - September 2014
- EIS Volume 1 08.10.14
- EIS Volume 2 08.10.14
- EIS Volume 3 08.10.14
- Drawings - September 2014
- NIS 08.10.14
- An Bord Pleanála – Further Information – August 2015
- Response to Rahasane Turlough Shareholders Committee
- Response to BIM
- Response to Brendan Slevin
- Response to Clarinbridge Oyster Co-op
- Response to DAHG
- Response to IE
- Response to IFI
- Response to MI Fisheries Ecosystem Advisory Services
- Response to NRA
- Response to Numerics Warehouse
- Dunkellin Drainage District - Progress Report September 2016
- Dunkellin Progress Report August 2017
- Dunkellin FRS progress REport November 2017
- Dunkellin Progress Report May 2018
- Dunkellin FRS - Progress Report December 2018
- Dunkellin FRS - Progress Report June 2020
- Collated Water Sampling Data 2016-2021
- Rahasane Turlough Monitoring Report for 2021
- Architectural Heritage and Conservation Report on Bridges
- Rahasane Turlough Monitoring Report for 2022
- Dunkellin Burials – Final Excavation Report April 2023
- Dunkellin Burials – Appendix 1, Osteoarchaeological Report April 2023
- Dunkellin Burials - Appendix 2, Radiocarbon Report February 2023
- Rahasane Turlough Monitoring Report for 2023
Find us
on Facebook
Follow us
on Twitter
Gaeilge
agus Fáilte